Finished plans mean no delays to join the building boom in Norris Square! This includes a complete permit set (architectural, electric, fire, mechanical, plumbing, and structural) for an energy-efficient 3-unit residential building with a 2-bed/2-bath bi-level unit with a rear yard on the ground floor and two 2-bed/1-bath units above. Additional completed work includes a geotechnical report, a survey, streets dept approval documents, and a WUFI (energy use) analysis. It's five minutes by foot to the El/MFL/subway, one minute to Norris Square Park (a large, popular park the same size as Rittenhouse), one block from the new protected bike lanes on American St, and surrounded by a staggering amount of new construction. Zoned CMX-2.